The building was completed in 2016, with FMDC providing Façade Consultancy services from initial engagement in Stage 2, to completion on site.
A key element of the façade is the Armenian Tuff stone, employed as a rainscreen, fixed to the unitised panels. FMDC geologists played an important role in the specification and procurement of this unusual material, visiting the quarry and fabrication facility in Armenia with the client, Contractor and Architect, to agree acceptable range limits. This highly successful building has retail and restaurant programme at ground floor and a roof terrace to supplement 9 floors of office space.
Subscribe to our mailing list
FMDC Ltd.
Façade & Materials Design Consultants
1st Floor St. John’s House
53-54 St. John’s Square
London EC1V 4JL
+44 (0)203 735 5211
info@fmdc.co.uk
©2023 FMDC Ltd. · Registered in England and Wales, Company Number: 08317861.