The project was built by Skanska as main Contractor and was completed in 2017. The rear Mews elevation uses long format Peterson Tegl bricks with punched steel windows, to reflect the more utilitarian nature of the service mews.
FMDC were engaged from early design stages through to completion on site, in a CMT type capacity, to monitor quality and adherence to the design intent.
Subscribe to our mailing list
FMDC Ltd.
Façade & Materials Design Consultants
1st Floor St. John’s House
53-54 St. John’s Square
London EC1V 4JL
+44 (0)203 735 5211
info@fmdc.co.uk
©2023 FMDC Ltd. · Registered in England and Wales, Company Number: 08317861.